Education Projects

Madison School District

Multiple Projects

MMSD logo with photo of school children behind

location

Madison, Wisconsin

ARCHITECT

Varies

OWNER

Madison Metro School District

Education Projects

Madison School District

Multiple Projects

MMSD logo with photo of school children behind

location

Madison, Wisconsin

ARCHITECT

Varies

OWNER

Madison Metro School District

Kennedy Elementary Addition | 2022

Boiler Replacement; Zimmerman Architects

Frank Allis Elementary Renovation | 2019

Two elevators, accessibility ramps and a renovated main office with a secure entrance at Frank Allis Elementary School; Plunkett Raysich Architects

Shorewood Elementary Addition | 2019

A new ramp to the entrance and two elevators at Shorewood Elementary School; Plunkett Raysich Architects

East High School Auditorium Renovation | 2018

The nearly $5 million project expanded and radically improved the space, with added or improved features including enhanced lighting, far superior acoustics, a new orchestra pit with a cover, better dressing rooms and storage, and the addition of a 136-seat balcony. The renovated theater added about 100 additional seats; Plunkett Raysich Architects

Allis Elementary LMC Renovation| 2017

Replacement of 26 year old carpet along with the abatement of asbestos flooring located beneath the old carpet; Plunkett Raysich Architects

Franklin Elementary Renovation | 2017

Two elevators and a remodeled main office with a secure entrance at Franklin Elementary School; Plunkett Raysich Architects

Lakeview Elementary Renovation

An elevator, a remodeled secure entrance (including new doors, buzzers and cameras) and a remodeled bathroom suite for students at Lakeview Elementary School

Related Projects

Madison Area Parks
Olin Park Facility