Education Projects
Madison School District
Multiple Projects
location
Madison, Wisconsin
ARCHITECT
Varies
OWNER
Madison Metro School District
Education Projects
Madison School District
Multiple Projects
location
Madison, Wisconsin
ARCHITECT
Varies
OWNER
Madison Metro School District





Kennedy Elementary Addition | 2022
Boiler Replacement; Zimmerman Architects
Frank Allis Elementary Renovation | 2019
Two elevators, accessibility ramps and a renovated main office with a secure entrance at Frank Allis Elementary School; Plunkett Raysich Architects
Shorewood Elementary Addition | 2019
A new ramp to the entrance and two elevators at Shorewood Elementary School; Plunkett Raysich Architects
East High School Auditorium Renovation | 2018
The nearly $5 million project expanded and radically improved the space, with added or improved features including enhanced lighting, far superior acoustics, a new orchestra pit with a cover, better dressing rooms and storage, and the addition of a 136-seat balcony. The renovated theater added about 100 additional seats; Plunkett Raysich Architects
Allis Elementary LMC Renovation| 2017
Replacement of 26 year old carpet along with the abatement of asbestos flooring located beneath the old carpet; Plunkett Raysich Architects
Franklin Elementary Renovation | 2017
Two elevators and a remodeled main office with a secure entrance at Franklin Elementary School; Plunkett Raysich Architects
Lakeview Elementary Renovation
An elevator, a remodeled secure entrance (including new doors, buzzers and cameras) and a remodeled bathroom suite for students at Lakeview Elementary School